Surge & Lightning Protection Earthing Grounding System Installation

Connect earth rod to bare copper wire

The aim of this method statement is to describe electrical works associated with installation of earthing / grounding system, lightning surge protection systems. The grounding & lightning protection system are designed to ensure the complete safety of both persons and equipment throughout

2025
Oct
2

Parapet Wall / Parapet Roof Construction Method Statement

Method of Statement for Parapet Wall Construction

This parapet method statement will help to describe the procedure to for parapet wall and parapet roof construction works, that ultimately will ensure that the work is planned and performed in accordance with project technical specifications and drawings. The project manager will

2025
Aug
21

Oil Storage Tank Fabrication Welding and Erection Method Statement

Oil Storage Tank Fabrication Welding and Erection Method Statement

This tank fabrication method statement or procedure shall supplement the requirements of API 650 10th edition for construction, shop fabrications, field fabrications, welding and erection of oil storage tank for a project. In general all recommendations and suggestions advised in HSE Plan.

2025
Aug
14

Construction Quality Control Procedure for Excavation Earth Work and Back Filling (Foundations)

ACTION VERIFY  1.0     Scope This procedure provides a standardized framework for the control of excavation, earthwork and filling to ensure compliance with conditions of contract and contract specifications. 2.0     Procedure All excavation, earthwork and filling will be carried out in Project Director/

2025
Aug
10

Occupational Health and Safety HSE Accidents and Incidents Reporting and Investigation Procedure

This procedure describes the requirements on the notification, classification and reporting of all HSE accidents and incidents in order to ensure that notification and reporting of all accidents, incidents, diseases and dangerous occurrences is conducted in accordance with the requirement of the

2025
Aug
6

As Built Drawing and Documentation Project Management Procedure

This as built procedure describes the requirements for preparation of as built drawing and other project as build documentation. The purpose of this procedure is to ensure that variations from the original dimensions, design intent or materials shown on the drawings, specifications,